Lumber moves at framing. Roofing, windows, HVAC, electrical and plumbing move at rough-in. We track where every Los Angeles rebuild job stands, from public permits and inspections, and forecast what enters each stage next.

Palisades, as of Oct 16, 2026

Where the Palisades rebuild stands.

1,344

active rebuilds in the City of LA Palisades, tracked by stage

296

forecast to enter framing in the next 90 days

265

forecast to enter rough-in in the next 90 days

2.8 mo

typical time from framing to rough-in

Source: LADBS permits and inspections. Forecasts use typical times between stages.

What's in the feed

Weekly, by stage, by builder.

Jobs by stage

Foundation, framing, rough-in and finishes from Palisades inspections, plus plan check and permits in Malibu and Altadena.

90-day forecast

How many jobs enter framing and rough-in in each of the next three months, built from real inspection timing.

Builders running them

Which licensed builders have the most active jobs, and at which stage, so your reps call the right office. Malibu builder lists now; Palisades and Altadena as public records requests are answered.

Built carefully

Builder-level, never household-level.

The feed names licensed builders and counts jobs by area. It doesn't include site addresses or homeowner information. Your team sells to the builder, the way it should.

One version per category: lumber and framing, roofing, windows and doors, HVAC, electrical and solar, plumbing.